Installation Guide of Bridge Crane with Double Rail Trolley Hoist


Tools you need to prepare before installation: Wrench tool box, tow rope, gear oil, forklift, truck crane, etc.



The installation steps as below:

Fill the gearbox oil – electric cabinet installation – end carriage connection – buffer installation – festoon track installation – festoon installation – maintenance cage installation – Beam hoisting&Installation – Trolley hoisting&Installation – Crab Hoist Trolley installation – festoon cable connection – conductor rail installation – installation completed.

There is a installation guide video for your understand the installation more intuitively.


 

https://www.weihuabridgecrane.com/news/Installation-Guide-of-Bridge-Crane-with-Double-Rail-Trolley-Hoist.html
Email: weihua@craneweihua.com 
WhatsApp: +86 15093392066

2023年1月5日星期四

500 Tons Ladle Crane Quality Assessment

On July 5, 2022, Weihua made a new metallurgical ladle crane with capacity 500t and the main structure was successfully finished. The quality assessment was held in the production workshop. It once again refreshed the manufacturing record of Weihua's metallurgical cranes.



The crane is designed for a metallurgical workshop of an Iron and Steel company, with a 4-girder 6-rails structure, lifting capacity: 500/90/15t, span: 20.7m, working duty: A8. It is the first capacity 500t metallurgy industry bridge crane independently developed by Weihua.



Weihua carried out the whole fabrication process control from pretreatment-unloading-welding-finishing-assembly to test. Using the overall boring and milling processing of large structural parts, overall annealing and assembly of the main trolley frame and the gearbox. It proved again Weihua has a mature and reliable production process and quality assurance system for large and super-large metallurgical cranes.



In the on-site quality assessment meeting, the crane appearance, camber, web verticality, waviness, wheel parity and other parameters were comprehensively tested, and all of them passed the review successfully:

1. Pass rate of non-destructive testing of all welds is 100%;

2. The camber, the height difference of the same section of the track, the wheel line, the track gauge of the trolley, and the straightness of the track are 100% qualified.


https://www.weihuabridgecrane.com/news/500-Tons-Ladle-Crane-Quality-Assessment.html
Email: weihua@craneweihua.com
WhatsApp: +86 15093392066


Intelligent Crane for Electrolytic Copper Industry Has Good Performance

The special electrolytic copper crane independently developed by Weihua was successfully delivered to a project in Guangdong. As the biggest highlight of this crane, the special lifting spreader for copper electrolysis is used for the automatic discharge and loading of cathode (starting plate) and anode plate. It has the advantages of multiple functions, high automation, reliable insulation, stable performance, etc.



The spreader is independently developed by Weihua. Its main structure is made of high-quality stainless steel, with high strength, acid corrosion resistance, excellent quality and greatly reduced cost. It is really the best choice for users to reduce costs and increase efficiency. In addition, the spreader also has the following features:




1. Specially designed plate arrangement function and discharging device ensure that the initial cathode plate can be smoothly put into the tank;

2. It can meet the requirements of separate lifting and overall joint lifting of cathode plate and anode plate, with high efficiency;

3. The method of combining pre positioning with precision positioning is adopted, and the positioning accuracy is ± 2mm;

4. The opening and closing of the flat push type liquid receiving tray are stable to ensure that the electrolyte does not splash out.





Weihua has strong processing equipment. Only with strong processing capacity can it meet the complex processing needs of special lifting appliances for copper electrolysis.

There are many highlights in the design of spreader, and the comprehensive design of the main crane is also a masterpiece. It is equipped with a fully automatic operation system, with high operation efficiency, convenient operation and advanced performance.





1. The crane has 3 operation modes: fully automatic, semi-automatic and manual;

2. The crane adopts frequency conversion and PLC precise control, with high-precision positioning;

3. The cab can synchronously monitor the insulation status of spreaders, motors, transformers and other devices, and give an alarm when leakage occurs;

4. The four motor structure of traveling crane meets the deviation correction function and greatly improves the stability and reliability.

https://www.weihuacraneglobal.com/news/Intelligent-Crane-for-Electrolytic-Copper-Industry-Has-Good-Performance.html

Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

2022年12月25日星期日

180t Ladle Crane Deliver to Kazakhstan



Recently, 7 large-capacity cranes were shipping to Kazakhstan serving for a steel group project. The cranes including a 180-ton ladle bridge crane, a 90+90-ton semi-gantry crane, and a 100-ton bridge crane.






These cranes for metallurgy industry are designed with the European FEM standard. With modular design and modern computer technology, these cranes are fully automated, intelligent, suitable for the production site with a large temperature difference.









180-ton Ladle Crane Technical Features:

1. This ladle crane adopts a new rigid bridge structure with four girders, four rails and double trolleys, and the working level reaches A8;

2. The crane-weight is reduced by 10%, the height is reduced by 25%, and the width is reduced by 25%; the crane can be applied to the ambient temperature of -40°C to +60°C;

3. The new type of festoon cable power supply device that is resistant to high temperature radiation can operate reliably under the condition of high temperature radiation.









Technical Features of 90+90 ton Semi-gantry Crane:

1. This semi-gantry crane is a dedicated material charging crane for steel plant. The lifting capacity of the crane is 90+90t, the lifting height is 24m, and the working level is A8;

2. The crane is a latest design for the problems of limited production space, high risk factor of tilt-pulling and hoisting during feeding, and excessive wire rope tilt-pulling angle;

3. It adopts the structure of 3 girders and 4 rails, and 2 independent lifting mechanisms are designed on each trolley, equipped with a special four-point gantry hook spreader, and the two lifting mechanisms can realize the function of hopper dumping and feeding through their independent actions;

4. Finite element optimization check calculation of the overall structure, simulate the actual operating conditions of the crane, and reduce the dead weight and the wheel pressure by 10%;






Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

350t Bridge Crane Shipping to Steel Plant


Weihua made a 350t bridge crane for steel plant was shipping to the project site. The image shows the 9 large transport vehicles loaded with huge overhead cranes and accessories drove out of Weihua Intelligent Industrial Park in a mighty manner to the client's site.




The 350t casting bridge crane in this project is designed with a span of 37 meters with a 4-beam 6-track double-trolley structure. The main hoisting reducer is integrated with the frame. The manufacturing process of overall annealing and overall processing ensures the installation accuracy of gears, bearings, motors, brakes, etc. making the crane run more stably.




At present, the crane of this project have been sent to the customer's site one after another. The high-quality products and services will help the customer's project construction, and will once again demonstrate the outstanding strength of Weihua products in the large-tonnage metallurgical crane market.

Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

2022年12月21日星期三

500 Tons Ladle Crane Delivery

Weihua provides a capacity 500 tons heavy duty metallurgical ladle crane for a steel company. The crane is loaded on 4 trucks and shipping to the customer's site.

500 Tons Ladle Crane Delivery



This bridge crane is a capacity 500 tons 4-girder 6-Rail Metallurgical Crane independently developed by Weihua Crane. This time, only the main structure of this crane was delivered to a large steel company with steel production capacity reaching 6.5 million tons.



Features
It adopts strict and high-standard full-process control, overall processing of large structural parts, overall annealing treatment of the main trolley frame and the heavy-duty gearbox, and the overall assembly, thus the equipment stability is higher.



The electrical system uses advanced energy feedback technology, and the power generated by heavy machine loads is reused, which has greatly improved the energy utilization rate of equipment.


Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

Erection of Weihua Port Cranes at Jinhua Port

Jinhua Port, as the core node of Jinhua City to link up with the Belt and Road initiative, has a huge cargo throughput. Among them, the comprehensive modern port - Luoyang Operation Area will undertake the water cargo handling operations in Jinhua City.
Erection of Weihua Port Cranes at Jinhua Port



After the successful delivery of the project of Weihua port cranes to customers, it will promote the accelerated construction of Jinhua Port Luoyang Operation Area, and contribute to alleviating the pressure of cargo transportation and promoting high-quality economic development in Jinhua City.



Products of the project include 3 portal cranes and 1 rail mounted container gantry crane.