In March, the world's first high-level generator stator hoisting was successfully completed in a power plant in Shaanxi Province. This task is completed by the joint operation of 2 Weihua 170-ton overhead cranes with a lifting height of 80 meters.
The weight of the hoisted generator stator reached 290 tons, and the height of the layout platform reached 65 meters, making it the world's highest layout platform. Therefore, the project has extremely high requirements for the lifting equipment used.
The large tonnage, super-large lifting height and super-high lifting accuracy of the 660MW steam turbine generator set mounted on the world first boiler have become an essential element of the Weihua cranes in this project.
In order to match the uniform color of the customer's plant, Weihua products replaced the orange coat to white color to complete their lifting operations seriously. With its solid quality, Weihua products perfectly combine the mechanical design and the electrical design to take on the heavy responsibility of this project case.
http://www.weihuacraneglobal.com/case/Motor-Stator-Handling-Crane-170t-80m-for-Power-Plant.html
Email: weihua@craneweihua.com
http://www.weihuacraneglobal.com/case/Motor-Stator-Handling-Crane-170t-80m-for-Power-Plant.html
Email: weihua@craneweihua.com
没有评论:
发表评论