Overhead Crane for Garbage Disposal \ Weihua Crane

Basic Operation:
1. Feeding. Grab and feed Fermented garbage into waste incinerator.
2. Lifting and transport. Lift and transport the waste near the discharge door to avoid blocking the discharge door. Control the quantity of garbage in the waste pit to keep the inventory within 3~5d.
3. Mixing. Mix the garbage to extract water content and shorten the fermentation time, as well as keep safe of incineration.
4. Fetching. Fetch non-flammable objects in the pit.
5. Weighing. Weigh the garbage before being dump into the incinerator.

Garbage Disposal Overhead Crane


1. High lifting height with anti-sway operation.
2. Real-time dynamic measurement.
3. Grab status monitoring, fault diagnosis alarm and report statistics.
4. Adapt to harsh working conditions: high temperature, Humidity, more Dust and Gas corrosive.
5. Heavy work load: average 8,000h working time per year, High load rate, high work frequency.
6. Reliable work: less failed, guarantee smooth production.