我的博客列表

2023年4月23日星期日

Suspension Electric Crane with Multi-Pivot

 Full Name: Multi-Pivot electric hoist suspension crane with double rails.

This suspension crane is composed of beam, trolley, traveling mechanism, lifting mechanism, several electrical components. The design, manufacture and acceptance execute the required standards of JB / T 2603-2088 electric hoist suspension crane.

Features: Large span, multi-pivot/fulcrum, fast lifting speed, light weight, beautiful and practical, many structural design of the suspension crane are of industry precedent.

 

suspension-crane

 

This suspension crane is a multi-pivot crane with large span and rapid lifting, which is installed in the hot-dip galvanizing plant, mainly used to complete the lifting work during the whole steel galvanizing process. Drag bunk lifting equipment are set, and the cross are arranged without interference. The multi-pivot suspension crane is on the upper floor, four cranes are side-mounted on the plant load beam with linkage control.

https://weihuabridgecrane.com/news/Suspension-Electric-Crane-with-Multi-Pivot.html

Email: weihua@craneweihua.com

WhatsApp: +86 15093392066

Bridge Crane with Vacuum Sucking Spreader Beam

 Supplier: Weihua

User: Northeast Light Alloy Co., Ltd.

Product Name: Bridge Crane with Vacuum Sucking Spreader Beam Model QCL20 +20t.

Use: Aluminum alloy sheet feeding, unloading and transport.

 

Bridge-crane-suction-spreader

 

Features of Bridge Crane with Vacuum Sucking Spreader Beam:

1. Electric anti-sway control technology to ensure safe and smooth lifting work;

2. Accurate positioning control system realizes auto accurate handling;

3. Intelligent sensor for workpiece (aluminum alloy sheet) suction, sound and light alarm, safe and reliable;

4. Vacuum sucking beam with gentle connection, which can detect workpiece suction intelligently without collision or impact during adsorption and lifting.

 

Bridge-crane-suction-beam


https://weihuabridgecrane.com/news/Bridge-Crane-with-Vacuum-Sucking-Spreader-Beam.html

Email: weihua@craneweihua.com

WhatsApp: +86 15093392066

2023年4月19日星期三

Installation of Hydropower Bridge Crane in Honduras

 A 300t hydropower bridge crane powered by Weihua had delivered to Honduras. It is made for China Construction Group International Project for Honduras Patuka Ⅲ hydropower station construction. This bridge crane is mainly for the lifting of the hydropower generators and turbines.

 

The project is the first large-scale hydropower project in Honduras in the past 30 years. This bridge crane is designed with low headroom, lightweight, small wheel pressure, and there is safety brakes at reel drum tail. At present, the crane has been carried out installation and commissioning. Now it is preparing for the load test and acceptance work.

 

300t-bridge-crane

 

300t-bridge-crane-installation

 

300t-hydropower-bridge-crane

 

hydropower-bridge-crane

 

hydropower-bridge-crane-installation

 

hydropower-generator-bridge-crane

 

hydropower-turbine-bridge-crane

 

hydropower-bridge-crane-honduras


https://weihuabridgecrane.com/news/Installation-of-Hydropower-Bridge-Crane-in-Honduras.html

Email: weihua@craneweihua.com

WhatsApp: +86 15093392066

Weihua Bridge Crane Installation For Qinghai Electric Power

 bridge-crane-power-company

 

Weihua provided a bridge crane (span: 60.5m, lifting height: 54m) for China National Grid Qinghai Electric Power Company. This crane had been successfully transported to the Qinghai Electric Power Research Institute and now it is being installed.

 

bridge-crane-power-company-installation

 

Qinghai Electric Power Research Institute is an important technical support department and high-tech experimental research base of Qinghai Electric Power System. Because of its high performance and high altitude environment, it needs bridge crane with good performance. We takes full account of the actual environmental conditions of customers to ensure the quality of crane from design to manufacture.

 

bridge-crane-installation

 

The main girder of the crane is a partial rail box structure. The three-stage disintegration is designed and analyzed by ANSYS finite element data to ensure that the main beam has good stiffness and strength. The crane also adopts Weihua patent anti-swing control and correction technology to ensure safety and stability.

 

weihua-crane-intallation-qinghai

 

Know more about Power Station Bridge Crane


https://weihuabridgecrane.com/news/Weihua-Bridge-Crane-Installation-For-Qinghai-Electric-Power.html

Email: weihua@craneweihua.com

WhatsApp: +86 15093392066

2023年4月11日星期二

Multi-Function Electrolytic Aluminum Cranes Phase II Project

Multi-Function Electrolytic Aluminum Cranes Phase II Project



On November 30, 2017, Phase II project of Laibin Yinhai Aluminum Company was put into operation. The multi-function electrolytic aluminum crane crafted by Weihua was officially put into use. After one year of construction, the second phase project of Laibin completed the power-on test. And the annual output of electrolytic aluminum belts and primary aluminum will reach 500,000 tons. All multi-functional electrolytic cells of the second phase are produced by Weihua, and the successful launch of this project is a big leap for Weihua in electrolytic lifting industry.



Electrolytic aluminum multi-purpose crane is a large pre-baked aluminum electrolysis equipment, which is mainly employed to complete the following process operations:
1. Shell: Open the electrolyte crust;
2. Replace the anode: pull out the residual pole, put on a new anode;
3. Slag: pull out the residual pole, remove blocks in the molten aluminum;
4. Feeding: add alumina powder and covering material to the groove;
5. Lifting: lifting bus frame.



 


https://weihuabridgecrane.com/news/Multi-Function-Electrolytic-Aluminum-Cranes-Project.html

Email: weihua@craneweihua.com

WhatsApp: +86 15093392066

Installation of Bridge Crane Downshop Conductors

Installation of Bridge Crane Downshop Conductors



Downshop conductor is a device that supplies power for bridge crane traveling. It is composed of sheath, conductor, collector and some auxiliary components.



In order to facilitate the installation, the downshop conductor is usually installed on the track supporting beam. Take the unipolar combination downshop conductor installation as an example, there are 4 conductor bars, and the arrangement is easy to interfere with the crane walker attachment or main girder, as shown in the following figure:





In order to avoid the interference between the conductor and the crane, it is suggested to use the following 3 ways for installation:



1. Bending bracket for installation can effectively avoid interference problems. Bending height H can be determined according to the actual installation, it is recommended not less than 200mm.





2. The bracket is installed below the track bearing beam, and the sinking height H can be determined according to the actual installation, it is recommended not less than 200mm.



3. Adopt side installation.

No matter what kind of downshop conductor, it must be combined with the size of the plant and crane installation.

Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

2023年4月4日星期二

80/20t Bridge Crane for Tianwan Nuclear Power Plant





Tianwan Nuclear Power Plant is China-Russian nuclear energy cooperation project, which is the largest technical and economic cooperation project so far. Since the commercial operation of Units 1 and 2 in the first phase in 2007, the Tianwan Nuclear Power Station has cumulatively generated more than 160 billion kWh of electricity, which can be used by 100 million Chinese households for one year.

With the construction of the second and third phases of the Tianwan Nuclear Power Station, Weihua Crane has also frequently installed on the site. Recently, Weihua's 80/20t bridge crane for AC plant at Unit 6 of the Tianwan Nuclear Power Station has been in the installation and Weihua is about to serve Tianwan Nuclear Power Station again.

At 17:30 of March 28th, the 80/20t high position bridge crane for AC plant (radioactive repair workshop) of Units 5 and 6 was finished the installation, which creates conditions for the construction of the follow-up AC plant, and the installation of the main pump assembly platform.

At present, the No. 6 ring crane, rail beam, dome roof assembly and internal installation are under processing, and the construction site management pressure is very large. If the AC plant is installed on the site at the same time, it will affect the working of 1350T crawler crane for the dome.

In the face of site difficulties, the engineering company for Tianwan Project made full use of the time difference, completed the installation before the installation of the ring rail beams, and the work was completed in a safe and efficient manner.

Click to know more about Weihua Nuclear Power Station Crane.

Email: weihua@craneweihua.com
WhatsApp: +86 15093392066