Weihua Bridge Crane Installation For Qinghai Electric Power

 bridge-crane-power-company

 

Weihua provided a bridge crane (span: 60.5m, lifting height: 54m) for China National Grid Qinghai Electric Power Company. This crane had been successfully transported to the Qinghai Electric Power Research Institute and now it is being installed.

 

bridge-crane-power-company-installation

 

Qinghai Electric Power Research Institute is an important technical support department and high-tech experimental research base of Qinghai Electric Power System. Because of its high performance and high altitude environment, it needs bridge crane with good performance. We takes full account of the actual environmental conditions of customers to ensure the quality of crane from design to manufacture.

 

bridge-crane-installation

 

The main girder of the crane is a partial rail box structure. The three-stage disintegration is designed and analyzed by ANSYS finite element data to ensure that the main beam has good stiffness and strength. The crane also adopts Weihua patent anti-swing control and correction technology to ensure safety and stability.

 

weihua-crane-intallation-qinghai

 

Know more about Power Station Bridge Crane


https://weihuabridgecrane.com/news/Weihua-Bridge-Crane-Installation-For-Qinghai-Electric-Power.html

Email: weihua@craneweihua.com

WhatsApp: +86 15093392066

2023年4月11日星期二

Multi-Function Electrolytic Aluminum Cranes Phase II Project

Multi-Function Electrolytic Aluminum Cranes Phase II Project



On November 30, 2017, Phase II project of Laibin Yinhai Aluminum Company was put into operation. The multi-function electrolytic aluminum crane crafted by Weihua was officially put into use. After one year of construction, the second phase project of Laibin completed the power-on test. And the annual output of electrolytic aluminum belts and primary aluminum will reach 500,000 tons. All multi-functional electrolytic cells of the second phase are produced by Weihua, and the successful launch of this project is a big leap for Weihua in electrolytic lifting industry.



Electrolytic aluminum multi-purpose crane is a large pre-baked aluminum electrolysis equipment, which is mainly employed to complete the following process operations:
1. Shell: Open the electrolyte crust;
2. Replace the anode: pull out the residual pole, put on a new anode;
3. Slag: pull out the residual pole, remove blocks in the molten aluminum;
4. Feeding: add alumina powder and covering material to the groove;
5. Lifting: lifting bus frame.



 


https://weihuabridgecrane.com/news/Multi-Function-Electrolytic-Aluminum-Cranes-Project.html

Email: weihua@craneweihua.com

WhatsApp: +86 15093392066

Installation of Bridge Crane Downshop Conductors

Installation of Bridge Crane Downshop Conductors



Downshop conductor is a device that supplies power for bridge crane traveling. It is composed of sheath, conductor, collector and some auxiliary components.



In order to facilitate the installation, the downshop conductor is usually installed on the track supporting beam. Take the unipolar combination downshop conductor installation as an example, there are 4 conductor bars, and the arrangement is easy to interfere with the crane walker attachment or main girder, as shown in the following figure:





In order to avoid the interference between the conductor and the crane, it is suggested to use the following 3 ways for installation:



1. Bending bracket for installation can effectively avoid interference problems. Bending height H can be determined according to the actual installation, it is recommended not less than 200mm.





2. The bracket is installed below the track bearing beam, and the sinking height H can be determined according to the actual installation, it is recommended not less than 200mm.



3. Adopt side installation.

No matter what kind of downshop conductor, it must be combined with the size of the plant and crane installation.

Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

2023年4月4日星期二

80/20t Bridge Crane for Tianwan Nuclear Power Plant





Tianwan Nuclear Power Plant is China-Russian nuclear energy cooperation project, which is the largest technical and economic cooperation project so far. Since the commercial operation of Units 1 and 2 in the first phase in 2007, the Tianwan Nuclear Power Station has cumulatively generated more than 160 billion kWh of electricity, which can be used by 100 million Chinese households for one year.

With the construction of the second and third phases of the Tianwan Nuclear Power Station, Weihua Crane has also frequently installed on the site. Recently, Weihua's 80/20t bridge crane for AC plant at Unit 6 of the Tianwan Nuclear Power Station has been in the installation and Weihua is about to serve Tianwan Nuclear Power Station again.

At 17:30 of March 28th, the 80/20t high position bridge crane for AC plant (radioactive repair workshop) of Units 5 and 6 was finished the installation, which creates conditions for the construction of the follow-up AC plant, and the installation of the main pump assembly platform.

At present, the No. 6 ring crane, rail beam, dome roof assembly and internal installation are under processing, and the construction site management pressure is very large. If the AC plant is installed on the site at the same time, it will affect the working of 1350T crawler crane for the dome.

In the face of site difficulties, the engineering company for Tianwan Project made full use of the time difference, completed the installation before the installation of the ring rail beams, and the work was completed in a safe and efficient manner.

Click to know more about Weihua Nuclear Power Station Crane.

Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

600t Gantry Crane for Hydropower Project

Weihua made a 600t gantry crane for a hydropower project and this crane was successfully installed and delivered on the customer site. This product is independently developed, designed, and produced by Weihua, and is mainly used for the hoisting of offshore wind power pipe piles, tower barrels, wind blades, and other equipment. It has effectively promoted the development of the local clean energy system, which is helpful for promoting carbon peak and carbon neutrality.



Features of Weihua 600t Gantry Crane:
1. It has lightweight design, compact structure, light weight, low wheel pressure, and low energy consumption.
2. It adopts frequency conversion control, ensuring smooth lifting and operation, low impact and low noise.
3. High quality components are used, the crane is equipped with a hardened gear reducer, steel drum, rolling pulley, and 65Mn forged wheel.
4. The crane is equipped with a electrical deviation correction device to ensure synchronous operation of both cranes and achieve automatic deviation correction. The crane is also equipped with electronic control technologies such as safety monitoring.
5. Variable span, which can be changed from 40m to 50m as needed.


https://weihuacraneglobal.com/case/600t-Gantry-Crane-for-Hydropower-Project.html
Email: weihua@craneweihua.com
WhatsApp: +86 15093392066





2023年3月27日星期一

Weihua Bridge Crane Installation in Ukraine

On May 8, Weihua bridge crane for ArcelorMittal project in Ukraine is now being installed. Together with ArcelorMittal staff, our installation engineer is guiding the installation on site.


ArcelorMittal Steel Group is the world's largest steel producer. The lifting products were all European brand products before purchasing from Weihua Group. It is the first time for Chinese companies being listed as qualified suppliers of ArcelorMittal. The images shows the installation of bridge cranes for ArcelorMittal Project in Ukraine.



















https://weihuabridgecrane.com/news/Weihua-Bridge-Crane-Installation-in-Ukraine.html
Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

Know more bridge crane projects at https://www.weihuabridgecrane.com/case/

Weihua Develop Rotary Scrap Feeding Crane for Steel Industry

Weihua Develop Rotary Scrap Feeding Crane for Steel Industry

In the crane industry, it is known that crane is able to operate to 6 directions: up and down, left and right, front and rear. But do you know the rotating scrap feeding crane? Now I take you on a new skill of the rotary scrap feeding crane.

 

metallurgy-scrap-charging-crane

 

The born of rotary feeding crane solves the problems of space limitation of production workshop, large tilting angle of material trough and big tonnage of scrap feeding. It has the features of 270 degree rotation, strong operability, high safety factor, high stability and low friction, which is suitable for the metallurgy and steel industry.

 

rotary-charging-metallurgy-crane

 

After knowing this crane, you must be curious about its background? Next, I will tell you about this crane 'born' history.

 

Facing the challenges:

1. The trough is close to the wall, so the hook can only work in a small space;

2. The opposite side of the cabin is a flame-covered ladle, and the structure has high requirements for fire resistance and heat resistance;

3. All dumping of the scrap is required at one time, and the tipping angle of the trough shall be more than 60 degrees.

 

rotary-charging-overhead-crane

 

The Weihua Technology R&D team has overcome many technical problems and finally completed the design, fabrication and delivery. Weihua's first rotary scrap charging crane was successfully launched, and successfully carried out the running test of this special equipment. This project is a new breakthrough in product research and development in the steel feeding industry.

 

It is reported that due to the stable performance of the rotary feeding crane, another one is required and will soon be 'born'.

 

 


https://weihuabridgecrane.com/news/Weihua-Develop-Rotary-Scrap-Feeding-Crane-for-Steel-Industry.html

Email: weihua@craneweihua.com

WhatsApp: +86 15093392066