我的博客列表

2023年2月12日星期日

Weihua Group Start 2 Major Projects for Its Expansion

Just after the Chinese New Year holiday, Weihua starts its major strategic projects such as Jiangsu Weihua and Zhengzhou Weihua Pilot Test Base. We wish a good start and prosperity all year round.



Jiangsu Tongzhou Bay is located at the "T"-shaped joint between the golden waterway and the Gold Coast. It is at the intersection of national strategies such as the Belt and Road initiative, the Yangtze River Economic Belt, and the integrated development of the Yangtze River Delta.



As the starting port area of Tongzhou Bay, Lvsi Port is located in the core of the Yangtze River Delta, with outstanding functions of river-ocean combined transport.



Jiangsu Weihua high-end intelligent port equipment project (referred to as Jiangsu Weihua) is the best area for natural berthing of large ships in Lusigang, covering an area of about 1,000 mu , The total length of the terminal coastline is 809 meters, and it is planned to build three 50,000-ton general-purpose berths. The preliminary project investment of the project is 5 billion yuan, and it is expected to be put into operation in June 2023. It mainly designs and manufactures port machinery, large bridges, heavy steel structures and marine engineering equipment.

Jiangsu Weihua is less than 100 kilometers away from Shanghai, and it takes one hour to drive to Shanghai Pudong Airport and Nantong Xingdong Airport.



Recently, the first steel column of the first phase workshop of Jiangsu Weihua High-end Intelligent Port Equipment Project was successfully hoisted. At present, the machines on the project site are roaring, and the workers are intensively carrying out foundation work.



On February 5th, Zhengzhou Weihua High-end Automated Parking Project Groundbreaking Ceremony was grandly held. The start of construction is the first phase of Zhengzhou Weihua pilot base project, with a planned investment of 3 billion yuan. The main projects include the main buildings such as the R&D building, automated parking system production base, and brand exhibition hall.


Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

2023年2月6日星期一

Weihua Bridge Crane Erection in Mexico

Weihua provides 17 sets bridge cranes for a machine manufacturing company in Mexico. The cranes including 11 models single girder bridge cranes and double girder bridge cranes. After shipping of the cranes, Weihua sent the installation team to Mexico for crane erection.

The installation team members to Mexico have all been vaccinated to prevent COVID-19, and they will strictly comply with the local epidemic prevention and control requirements. Our installation team mission is to complete the delivery and installation job of our products.


















Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

Weihua Europe-Standard Reducer Ready for Delivery


Recently, Weihua made a batch of new-design reducers successfully packed and ready for delivery to customers.



This reducer is a European Standard reducer designed with the advance technology. It has a modular design with hard tooth surface. For connecting the motor, this reducer adopts a motor direct connection design and is with a brake shaft extension. This reducer is designed for the European-standard cranes. It has the features of small size and simple installation.



After signing the contract, Weihua has started intensive preparations. After 20 days production, the reducer has finally successfully finished production under the comprehensive cooperation of multiple departments including design, quality, and production.

All internal parts are made by Weihua with High standards, high quality, high requirements. The reducer box body is all made by well-known brand machining center. It is fully inspected by a German three-coordinate measuring instrument. The gears are processed by a German gear grinding machine with precision grade reaching level 5 of ISO1328. The precision quality of the product is guaranteed, while the cost is greatly reduced.

Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

2023年1月27日星期五

Bridge Crane Installation Steps

Bridge Crane Installation Steps

Installation tools need prepare: Wrench box, chain hoist, tow rope, traction wire rope, wire rope sling, counterweight, forklift, truck crane, etc. Installation Steps:


1. Fill the gearbox oil

2. guard rail installation

3. bridge platform installation

4. crane Electric box installation

5. Signage installation

6. end carriage installation

7. crane buffer installation

8. end carriage door installation

9. Trolley electric box installation

10. maintenance cage installation

11. cabin installation

12. counterweight placement

13. Ladder installation

14. Beam hoisting&Installation

15. Trolley hoisting&Installation

16. chain hoist traction beams

17. end carriage connection

18. cable guard rail installation

19. remove the counterweight

20. drag chain installation

21. wire rope torsion release

22. wire rope sling pull the wire rope to crane drum

23. wind wire rope on crane drum

24. lower wire rope for hook installation

25. main hook installation

26. deputy hook installation

27. installation completed.









We also made a installation guide video for your reference.











Double Girder Bridge Crane at Weihua Workshop





Bridge Crane for a Green Building Material Company





Bridge Crane for a Nonferrous Metals Company

Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

Weihua Cranes for Water Conservancy Project


The 9 cranes provided by Weihua for the construction of Nianpanshan Water Control Project were delivered successfully.



Nianpanshan Water Conservancy and Hydropower Project, located in Zhongxiang City, is one of 172 major water conservancy projects for water conservation and water supply determined by the State Council to be included in the 13th Five-Year Plan. The total planned investment of the project is 6.636 billion yuan. It is a Class II large (2) project, mainly for power generation and shipping, and also for irrigation and water supply. Its normal pool level is 50.72m, capacity is 180MW, annual average power generation is 616 million kW • h, channel standard is Class III, and ship lock design standard is 1000t.



In this project, the customer has purchased many cranes, such as Weihua one-way gantry crane, fixed winch hoist, two-way gantry crane, trolley hoist, etc., which work together to accelerate the construction of Nianpanshan Water Conservancy Project.



This project shows the high recognition of customers and the strong strength of Weihua. Weihua solution also fulfills customer expectations, combines actual needs, and returns customer trust with a number of technical highlights:




1. The one-way gantry crane at the upstream of the sluice gate and the two-way gantry crane at the intake of the powerhouse are provided with a slewing crane at the downstream side, which increases the operating range of the gantry crane and improves the operating efficiency;

2. The drum of the gantry crane is designed with double-layer folded rope groove, which effectively avoids the phenomenon of disordered rope and rope friction;

3. Torque synchronous control of double lifting motors, for balanced force and stable operation;

4. There are brake opening and closing detection, wear detection, motor temperature detection, all kinds of protection are complete and reliable;

5. It is equipped with motor life detection system to monitor motor performance at all times.

6. The hoist of this project has compact structure layout with stable operation, complete and reliable monitoring information, which effectively supports the timely power generation, flood control, navigation and other work of the Nianpanshan Water Conservancy and Hydropower Project in Hubei Province.







Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

2023年1月8日星期日

Single Girder Bridge Crane Installation Guide

Single Girder Bridge Crane Installation Guide

Equipments and tools needed before installation: Wrench tool box, gear oil, tow rope, forklift, mobile truck crane.

 

5t-bridge-crane-installation-guide

 

Single beam bridge crane installation steps:

1. Fill the gearbox oil

2. end carriage connection

3. buffer installation

4. C-rail installation

5. electric box installation

6. electric hoist installation

7. adjust the gap to 3~5mm

8. festoon installation 

9. crane hoisting 

10. conductor rail installation

11. installation finished.

 

There is an installation guide video for your reference.

 

https://www.weihuabridgecrane.com/news/Single-Girder-Bridge-Crane-Installation-Guide.html


Email: weihua@craneweihua.com

WhatsApp: +86 15093392066


Installation Guide of Bridge Crane with Double Rail Trolley Hoist


Tools you need to prepare before installation: Wrench tool box, tow rope, gear oil, forklift, truck crane, etc.



The installation steps as below:

Fill the gearbox oil – electric cabinet installation – end carriage connection – buffer installation – festoon track installation – festoon installation – maintenance cage installation – Beam hoisting&Installation – Trolley hoisting&Installation – Crab Hoist Trolley installation – festoon cable connection – conductor rail installation – installation completed.

There is a installation guide video for your understand the installation more intuitively.


 

https://www.weihuabridgecrane.com/news/Installation-Guide-of-Bridge-Crane-with-Double-Rail-Trolley-Hoist.html
Email: weihua@craneweihua.com 
WhatsApp: +86 15093392066