我的博客列表

2022年2月27日星期日

Weihua Equipment for Bulk Material Handling Projects

Weihua bulk material conveying equipment has won numerous praises from customers for its design capabilities, intelligent electrical control systems, green and environmentally friendly dust suppression technology and full process production capabilities. Now let's have a look at some projects supported by Weihua Material Handling Equipment.
Weihua bulk material conveying equipment



In the first phase of a Wharf Project in China, Weihua undertook a total of 11 fixed belt conveyors, 5 mobile belt conveyors, 4 transfer stations, 2 transfer funnels, and 2 ship loader, 2 floating cranes.



For supporting terminal project of the 40 million tons/year refining and chemical integration base in a Petrochemical company, Weihua provide dry bulk terminal belt conveyor and ancillary equipment system including 8 belt conveyors and other ancillary equipment systems, of which 4 sets 2200mm large-bandwidth conveyor with a belt speed of 5m/s and a transportation volume of 7680t/h. It adopts a central three-drive arrangement, with a motor power of 3x800kw and a single machine length reaches 950m.



In the first phase of the project of a Coal and Iron Distribution Base, Weihua provides 36 belt conveyors with a total length of about 13km, belt width 1400mm-2200mm, and a maximum conveying capacity of 8000t/h.



Weihua made the belt conveyor equipment for the railway loading system of a Mining Company. This project includes 5 new and 4 modified belt conveyors with a total length of 1711m and a transportation capacity of 5000t/h with a speed of 5.0m/s.



In a Coal Mining company project, the Weihua provide the retractable belt conveyor with total length of 6.3 kilometers, conveying capacity of 5000t/h, belt speed of 4.5m/s, and a belt width of 1600mm. It is controlled by a frequency conversion integrated machine.


As the core equipment of the coal conveying line of a Cogeneration Project. Weihua provides a cantilever bucket wheel stacker and reclaimer for the storage and handling of coal of this power plants.


 



https://www.weihuacraneglobal.com/news/Weihua-Equipment-for-Bulk-Material-Handling-Projects.html
Email: weihua@craneweihua.com
WhatsApp: +86 15093392066


2022年2月20日星期日

Weihua 300 Tons Overhead Crane for Steel Foundry Plant

 On May 18th, the Capacity Upgrade Project of an Iron and Steel Company blast furnace was successfully ignited. The project entered the stage of full-line production, opening a new chapter in the optimization of the layout, transformation and upgrading of the iron and steel industry in Henan Province.

 

ignition-ceremony

 

Weihua made several capacity 300t overhead cranes for its steel foundry plant. These cranes are with four-girder four-track structure, which is for the task of foundry process transfer, converter charging, refining and molten steel receiving.

 

300t-overhead-crane-for-foundry-plant

 

Features of Weihua Foundry Cranes

 

1. Overall processing

The overall annealing and overall processing of the main hoisting frame ensure the installation accuracy of gears, bearings, motors, brakes, etc., with low noise, smoothness and no impact; the overall processing of the bridge frame ensures product wheel line accuracy and more stable operation.

 

2. Life service life

The detachable plate hook lining makes longer service life of the spreader.

 

3. Dual transformer mode

The transformer adopts the dual transformer mode of power transformer + auxiliary transformer.

 

Overall-annealing

 

4. Double Regulate

The whole crane is equipped with a backup redundant system. When a certain mechanism fails, the backup system can be quickly switched to ensure that the equipment does not stop and operates safely for 24 hours.

 

5. Safety projection warning

The system is equipped with a safety projection warning device, which can effectively remind ground personnel to perform safe operations when driving.

 

6. Safety management system

Analyze the crane's operating status, working hours and usage times of wearing parts to facilitate equipment maintenance.

 

300t-steel-foundry-plant-crane

 

7. Multiple security protection

The boarding gate is equipped with a permanent magnet door switch, and a deceleration stop alarm system is designed in the corresponding operating mechanism.

 

8. Compact structure layout

The control system has a compact structure layout, which satisfies the application functions of short-span cranes.

 


https://www.weihuacraneglobal.com/news/Weihua-300T-Overhead-Crane-for-Steel-Foundry-Plant.html

Email: weihua@craneweihua.com

WhatsApp: +86 15093392066

 

Installation of Double Girder Overhead Crane with Double Rail Trolley Hoist

Tools before installation: Wrench tool box, tow rope, gear oil, forklift, truck crane, etc.


overhead-crane-with-double-rail-trolley-hoist-installation

 

The installation guide is as below:

1. Fill the gearbox oil

2. Electric cabinet installation

3. End carriage connection

4. Polyurethane buffer installation

5. Festoon track installation

6. Festoon installation

7. Maintenance cage installation

8. Girder hoisting&Installation

9. Trolley hoisting&Installation

10. Double-rail Hoist Trolley installation

11. Festoon cable connection

12. Conductor rail installation

13. Installation completed.

 

There is an installation guide video for your better understanding.

 


https://www.weihuacraneglobal.com/news/Installation-of-Double-Girder-Overhead-Crane-with-Double-Rail-Trolley-Hoist.html

Email: weihua@craneweihua.com

WhatsApp: +86 15093392066

 

2022年2月13日星期日

Weihua Overhead Crane Installation in Mexico


Weihua made 17 sets overhead cranes for a Mexico machine manufacturing company. The products including 11 models single girder overhead cranes and double girder overhead cranes. After shipping, Weihua sent the installation team to Mexico for crane installation task.

The installation team members who went to the project site have all been vaccinated in China, and they will strictly comply with the local epidemic prevention and control requirements. Our installation team will do their best to complete the delivery and installation job to guarantee the project successful running.














https://www.weihuacraneglobal.com/news/Weihua-Overhead-Crane-Installation-in-Mexico.html
Email: weihua@craneweihua.com
WhatsApp: +86 15093392066

New Design Gearbox Ready for Delivery

 Recently, a batch of new-design reducers developed by Weihua has been successfully packed and ready for delivery to customers.

 

crane-reducer-for-lifting-motor
new-design reducers

 

This reducer is a European Standard reducer designed with the latest concept. It adopts a modular design with hard tooth surface. In the structure, it adopts a motor direct connection design and is equipped with a brake shaft extension. This product is a special model designed for the European-style crane. It has the characteristics of small space size and convenient installation.

 

gearbox-for-crane-lifting-mechanism

 

Since receiving the order, Weihua has started intensive preparations. After 20 days of hard work, the product has finally successfully finished production under the comprehensive cooperation of multiple departments including design, quality, and production.

 

All internal parts are made by ourselves with High standards, high quality, high requirements. The box body is all made by advanced machining center. It is fully inspected by a German three-coordinate measuring instrument. The gears are processed by a German gear grinding machine with precision grade reaching 5 grade of ISO1328. The precision quality of the product is guaranteed, and the cost is greatly reduced.


https://www.weihuacraneglobal.com/news/New-Design-Gearbox-Ready-for-Delivery.html

Email: weihua@craneweihua.com

WhatsApp: +86 15093392066

2022年2月6日星期日

Installation Guide of Double Girder Overhead Crane

 Tools you need to prepare before installation: Wrench tool box, chain hoist, tow rope, traction wire rope, wire rope sling, counterweight, forklift, truck crane, etc.

 

The installation steps as below:

Fill the gearbox oil – guard rail installation – bridge platform installation – crane Electric box installation – Signage installation – end carriage installation – crane buffer installation – end carriage door installation – Trolley electric box installation – maintenance cage installation – cabin installation – counterweight placement – Ladder installation – Beam hoisting&Installation – Trolley hoisting&Installation – chain hoist traction beams – end carriage connection – cable guard rail installation – remove the counterweight – drag chain installation – wire rope torsion release – wire rope sling pull the wire rope to crane drum – wind wire rope on crane drum – lower wire rope for hook installation – main hook installation – deputy hook installation – installation completed.

 

Weihua Crane

 

There is a installation guide video for your understand the installation more intuitively.

 

 

Double-girder-overhead-crane-at-weihua-workplant

Double Girder Overhead Crane at Weihua Workplant

 

Overhead-crane-for-green-building-company

Overhead Crane for a Green Building Material Company

 

crane-for-Nonferrous-Metals-Company

Overhead Crane for a Nonferrous Metals Company

 

https://www.weihuacraneglobal.com/news/Installation-Guide-of-Double-Girder-Overhead-Crane.html

Email: weihua@craneweihua.com

WhatsApp: +86 15093392066

Installation Guide of Double Girder Gantry Crane

 Tools you need to prepare before installation: Wrench toolbox, gear oil, welder, hydraulic jacks, chain block, steel tape measure, tow rope, traction wire rope, wire rope sling, support equipment for leg installation, installation platform for leg installation, forklift, truck crane, etc.

 

gantry-crane-installation-guide

 

The installation steps as below:

Fill the gearbox oil – calculate installation position - confirm the diagonals are equal – main beam connection installation – end carriage installation – drag chain installation – guardrail installation – saddle installation – lower beam and wheels installation – legs installation – pull rope and platform installation – cable drum installation – ladder installation – working platform installation – confirm the diagonals are equal – cabin installation – ladder installation – main beam installation with leg support equipment – main beam and legs connection – remove the working platform and pull rope – remove leg support equipment – trolley hoist hoisting and installation – drag chain installation – rain cover installation – wire rope torsion release – connect wire rope with sling – sling pull the wire rope to drum and winding – lower the wire rope to ground – hook installation.

 

There is a installation guide video for your better understanding.

 


https://www.weihuacraneglobal.com/news/Installation-Guide-of-Double-Girder-Gantry-Crane.html

Email: weihua@craneweihua.com

WhatsApp: +86 15093392066