Overhead Cranes, Gantry Cranes, Container Cranes, Port Cranes, Electric Hoists, Crane Accessories... Homepage: https://www.weihuacraneglobal.com
我的博客列表
2020年7月10日星期五
La grúa Viajera birriel con polipasto electrico
La grúa Viajera birriel con polipasto (Email: weihua@craneweihua.com) eléctrico su diseño y fabricación de conformidad estricta con la norma FEM / DIN, tiene el motorreductor triples, este producto con el control de frecuencia, funcionamiento suave y bajo ruido.
https://www.weihuacraneglobal.com/product/Overhead-Crane-with-Electric-Hoist--Double-Girder-Overhead-Crane.html
El montaje en carril de grú pórtico
La grúa pórtico montada sobre (Email: weihua@craneweihua.com) riel aplica al equipo de elevación de contenedor del tamaño variado,su viga principal utiliza el análisis y cálcul de fatiga,el contenedor con el sistema de seguimiento y elevación automáticos,la cabina tiene una visibilidad panorámica.
https://www.weihuacraneglobal.com/product/Rail-Mounted-Container-Gantry-Crane--Rail-Mounted-Gantry-Crane.html
Email: weihua@craneweihua.com
2020年7月7日星期二
Tube Belt Conveyor / Weihua Group
As a kind of environment-friendly continuous transport equipment, the circular tube belt conveyor is mainly used for transporting coal, colliery coal, coke, blending materials, sintered ore, mineral powder, petroleum coke, limestone, sand-gravel aggregate, acetylene sludge, humidifying dust, chemical fertilizer, salt, waste paper, phosphorus gypsum, sulfur-iron slag and all kinds of bulk materials. The circular tube belt conveyor has the same working principle with the ordinary belt conveyor; namely, make use of friction to move the conveyor belt and its materials. The most of components can be commonly used with the ordinary belt conveyor, however, the difference is that the conveyor belt shall be rolled up in the circular tube shape.
Performance Features:
1. It can seal and transport the bulk materials.
2. It can arrange the transport routines in the space warp way.
3. It can enhance the transport inclination angle.
4. There is no off-tracking phenomenon.
5. It can transport materials in two directions.
Principle and Structure of Circular Tube Belt Conveyor:
1. Common discharge port
2. Charging port
3. Transition section of materials receiving
4. Special tubulous tape
5. Transition section of materials unloading
6. Transmission Roller
circular tube belt conveyor |
When the conveyor belt has received the materials from the transition section on its tail, the conveyor belt will be rolled up in the circular tube shape gradually, then, the circular tube tape will be applied to transport the materials in the sealed way, then, the conveyor belt will be unfolded gradually when the materials are transported to the head transition section until the materials are discharged. (As the figure shows)
https://www.weihuacraneglobal.com/product/Tube-Belt-Conveyor.htmlEmail: weihua@craneweihua.com
Derrick Crane 330t / Weihua Crane / Weihua Group
A derrick crane is a lifting device usually composed of mast (frame or tower) and lifting arm. There are three or four lines connecting the mast to the lifting arm, which controls it goes up and down. To lift a load, a separate line runs under the lifting arm with a hook as the hoisting mechanism.
derrick crane |
Derrick cranes are docking facilities mounted on vessels or dockside. Recently, Weihua made a 660t derrick crane for Jiangsu Jinghu Heavy Industry, China. This crane is employed to lift 22,000m3 LPG tanks, which consists of platform/base, lifting arm and A-frame mast. It is designed with 2 hooks with capacity 2*330t. The arm length is 70m with luffing 21.5-54m, mast diameter is 1.6m.
Features:
1. There are 4 driving system for hoisting mechanism, 2 driving system for luffing mechanism.
2. The entire derrick crane chassis adopt basin support on concrete platform, which can effectively ease the crane horizontal and vertical deformation.
3. Multi-layer winding line reel drum. Hoisting winding drum wrapped with 4 layers of wire rope, and luffing drum is wrapped with 5 layers of wire rope.
4. Complete frequency, lifting half load speed is 2 times of the full load speed.
5. Using inverter, encoder and a series of electronic control system to ensure the 4 lifting motors keep synchronous running.
Email: weihua@craneweihua.com
2020年6月28日星期日
Marine Deck Crane / Deck Crane / Weihua Crane
Marine deck cranes are designed for safe and effective loading and unloading of cargo on general cargo ships, container cargo ships, bulk carriers and other transport ships. Marine deck crane is suitable for bulk carrier, container vessel, engineering ships which are voyaging international or domestic.
Marine deck cranes |
The hydraulic system of Weihua deck crane innovatively adopts a closed system instead of the open system, solving the problem of the lifting brake control, which is rare to see for deck cranes. After successfully applying the closed system of the deck crane, the hydraulic oil consumption has been reduced by more than half compared to the open system deck cranes, and the power consumption has also been greatly reduced. This is a major breakthrough in energy saving and environmental protection. This crane has obtain 6 national patents.
Features of Weihua Deck Crane:
1. Built-in machine, electric, hydraulic, integrated system.
2. Fully hydraulic drive.
3. Self-diagnosis wave compensation system.
4. Luffing load horizontal movement technology.
5. Eight safety devices including torque limiter, etc.
6. Visible safety monitoring system.
30t/36t Deck Crane Standard Speed:
30t/36t Deck Crane Fast Speed:
Email: weihua@craneweihua.com
Weihua Starts Intelligent Industrial Park Phase III
The main project of the second quarter of 2020 in Changyuan City and the commencement ceremony of the third phase of the Weihua Intelligent Lifting Equipment Industrial Park are held on the morning of June 28th, 2020.
Qin Baojian, Secretary of the Changyuan Municipal Committee, Yan Lei, Director of the Office of the Municipal Party Committee, Liu Wenjun, Member of the Standing Committee and Deputy Mayor of the Municipal Committee, Han Hongan, Chairman of Weihua Group, Yu Youfei, President of the Company, and Long Hongxin, General Manager of Weihua Co., Ltd., etc., attended the ceremony to witness the important moment. The ceremony was presided over by Yang Yihong, Secretary of the Municipal Commission for Discipline Inspection.
More than 600 employees of the Weihua Group and leaders from Municipal Party Committee Office, Development and Reform Commission, Finance Bureau, Commerce Bureau, Natural Resources Bureau, Housing and Urban-rural Construction Bureau, Market Supervision Bureau, Eco-Environment Bureau, Science, Industry and Information Bureau, Education and Sports Bureau, Financial Work Bureau, Nanpu Street, Power Supply Company participated in the groundbreaking ceremony.
Secretary of the Municipal Party Committee Qin Baojian announced the commencement of the concentrated construction of major projects in Changyuan City and the third phase of Weihua Intelligent Lifting Equipment Industrial Park.
The guests attending the ceremony jointly laid the foundation for the third phase of Weihua Intelligent Lifting Equipment Industrial Park.
The chairman of the Weihua Group, Han Hongan, introduced the project situation of Weihua Intelligent Lifting Equipment Industrial Park. He said that since the start of the Weihua Intelligent Lifting Equipment Industrial Park, it has received close attention and strong support from many people. Leaders have solved the problems in the progress of the industrial park project. After hard work day and night, Weihua Lifting Intelligent Industrial Park has successfully completed the first and second phase construction and put into production. The total land area of the third-phase project started today is 431,000 square meters, with a total construction area of about 265,000 square meters, and the project investment amount is 1.5 billion yuan.
In order to ensure the perfect ending of the third phase of the project, Han Hongan requested a higher standard for the construction of Weihua Intelligent Lifting Equipment Industrial Park. All the Weihua people should only strive to make new and greater contributions to the country and Changyuan.
Email: weihua@craneweihua.com
La grúa de pórtico
La grúa pórtico utiliza el diseño de modularización (Email: weihua@craneweihua.com) para el mecanismo de elevación, con líder tecnología mundial en antibalanceo, la barandilla con tubo rectángulo del acero y sus ruedas de acero de aleación de forja con alta resistencia.
https://www.weihuacraneglobal.com/product/FEM-DIN-Double-Girder-Gantry-Crane.html
订阅:
博文 (Atom)