我的博客列表

2019年11月27日星期三

Multifunction Crane for Electrolytic Aluminum / Weihua Crane

Electrolytic multifunctional cranes are auxiliary equipment for large-scale pre-baked anodic aluminum electrolytic production. Multifunction Crane for Electrolytic Aluminum can meet the environmental requirements and process requirements of high temperature molten salt, high current, strong magnetic field, dusty working site, and complete the process of prebaked anode aluminum operating.

Electrolytic-aluminum-crane

Electrolytic-Aluminum-overhead-crane

Multifunctional Crane for Electrolytic Aluminum is composed of feeding mechanism, slagging mechanism, the anode replace mechanism, shelling mechanism and aluminium discharging mechanism.
Electrolytic aluminum overhead crane is a large process equipment for pre-baked aluminum electrolysis, which is mainly used to complete the following task:
1. Shell: Open the electrolyte crust;
2. Replace the anode: pull out the residual pole, put on a new anode;
3. Slag: pull out the residual pole, remove blocks in the molten aluminum;
4. Feeding: add alumina powder and covering material to the groove;
5. Lifting: lifting bus frame.
electrolytic-aluminum-Overhead-crane

2019年11月21日星期四

Boat and Yacht Handling Crane / Weihua Crane

Yacht handling cranes, also known as boat handlers. It is widely used in water sports games, yacht clubs, navigation, shipping and learning, etc. It can transport different tonnage (32 tons - 1000 tons) of boats or yachts from the shore dock for on-shore maintenance, repair or launching of new vessels.


The boat and yacht handling crane includes the following items: main structure, traveling wheel block, hoisting mechanism, steering mechanism, hydraulic transmission system and electric control system. The main structure is N type, which can transfer the boat/yacht with height surpass crane's height.

boat-handling-crane

According to different requirements of our customers, the boat handling crane can handle different tonnage boats or yachts (10T-800T) from the shore side, it can be used for the maintenance on the shore side or can put the new boat into the water. This yacht handling crane has soft and firm belt to lift the boat and yacht so that it will never hurt the surface. This crane also can put the boat in sequence quickly with small gap between each two boat.

yacht-crane

Features of Yacht Handling Crane:
1. For the crane traveling, this crane can move in diagonal direction, this boat and yacht handling crane also can steer in 90 degree and put the boat in any designated position according to requirements.
2. This crane can be adjusted the width of the main girder according to the boat in case to handling different side boat.
3. This yacht handling crane is of low expense, high performance, easy to operate and maintenance and so on.
4. Low cost on the daily operation, it adopts the soft and firm belt to ensure there is no harm to the boat when hoisting.
5. This boat crane can make the boat in order quickly; it also can adjust the gap between each boat according to different condition.

Gantry Crane for Ship Building / Weihua Crane

The ship building gantry crane can be single girder gantry crane and double girder gantry crane. When it comes to large span and lifting weight, we suggest the single girder gantry crane for ship building which is more economy.


The single girder gantry crane for ship building is mainly composed of steel gantry frame, upper trolley, lower trolley, trolley travelling mechanism, maintenance, lubrication, elevator and electric equipment. And there are rail clamp device (or wheel actuator), anchor device, lifting weight limiter system, wind speed and direction system, limit switch of each mechanism, and the other safety protection device for this crane. The deviation rectifying system can be equipped in case of very large span.

ship-building-gantry-crane

Weihua has rich experience on the manufacturing of gantry cranes for ship building with big lifting weight, lifting height and span.

Main Data of Gantry Crane for Ship Building:
1. Lifting weight: 10-200t;
2. Lifting height: 8-12m;
3. Standard span: 5-35m

gantry-crane-for-shipbuilding

ship-build-gantry-crane


2019年11月19日星期二

RMG Crane for Railway Track Handling



There are 4 linkage working rail mounted gantry crane (Email: weihua@craneweihua.com) for handling of 100 meters long high speed rail tracks at railway freight yard.

http://www.weihuagantrycrane.com/product/RMG-Crane-for-Steel-Track-Handling.html

Euro Style Crane Trolley Assembly



You will see the assembly of Weihua Euro style crane trolley (Email: weihua@craneweihua.com) including assembly of trolley frame, reducer, motor, reel drum, brake, hoist limiter, etc.

http://weihuacraneglobal.com/product/FEMDIN-Crane-Trolley--Crane-Trolley.html

2019年11月11日星期一

Derrick Crane / Weihua Crane

A derrick crane is a lifting device usually composed of mast (frame or tower) and lifting arm. There are three or four lines connecting the mast to the lifting arm, which controls it goes up and down. To lift a load, a separate line runs under the lifting arm with a hook as the hoisting mechanism.


Derrick cranes are docking facilities mounted on vessels or dockside. Recently, Weihua made a 660t derrick crane for Jiangsu Jinghu Heavy Industry, China. This crane is employed to lift 22,000m3 LPG tanks, which consists of platform/base, lifting arm and A-frame mast. It is designed with 2 hooks with capacity 2*330t. The arm length is 70m with luffing 21.5-54m, mast diameter is 1.6m.

Derrick-crane

Features:
1. There are 4 driving system for hoisting mechanism, 2 driving system for luffing mechanism.
2. The entire derrick crane chassis adopt basin support on concrete platform, which can effectively ease the crane horizontal and vertical deformation.
3. Multi-layer winding line reel drum. Hoisting winding drum wrapped with 4 layers of wire rope, and luffing drum is wrapped with 5 layers of wire rope.
4. Complete frequency, lifting half load speed is 2 times of the full load speed.
5. Using inverter, encoder and a series of electronic control system to ensure the 4 lifting motors keep synchronous running.

derrick

derrick-crane-660t

Weihua Bucket Wheel Stacker and Reclaimer for Thermoelectric Company

Manufacturer: Henan Weihua Heavy Machinery Co., Ltd.
Work place: Jingneng Qinhuangdao Thermal Power Co., Ltd.
Duty: The core equipment of the power transmission line of the power plant, responsible for the storage and handling of coal-fired power plants.


Model: DQL1100/1500·30
Regular use: 1 set for working with 1 set backup or 2 sets working at the same time
Stacking capacity: 1500t/h
Reclaiming capacity: 300~1100t/h (adjustable frequency conversion)
Working coverage radius: 30m
Stacking height: 11m on the rail, 1.5m below the rail
Rotation angle: ±110°
Boom pitch angle: +10°~-13.9°

coal-bucket-wheel-stacker-reclaimer

Features:
1. Multiple operation modes
Single action mode, manual mode, automatic mode and local mode can be switched freely according to different operation requirements without any interference effect;
2. Automatic controllable operation, real-time data feedback
The PLC main control device realizes the full automatic control of the stacker and reclaimer operation, collects the pile shape data through the instrument, and feeds the material storage condition in real time;
3. Three-dimensional anti-collision, accurate and reliable positioning
The three-dimensional anti-collision system is based on high-reliability and high-precision positioning system detection and attitude detection, and realizes anti-collision between equipment and material piles, equipment and equipment, equipment and devices along the track;
4. Timely warning, double security protection
Mechanical and inductive limit switches are set at each operating mechanism, and warning warnings and limit parking points are set in the program monitoring to establish double safety protection;
5. Two-line intelligent lubrication, reducing labor intensity
The whole equipment adopts electric centralized lubrication, which greatly reduces the labor intensity; the two-line intelligent centralized lubrication system is adopted, and the lubrication effects of the front and rear lines do not affect each other. The intelligent monitoring system can indicate the fault point and reduce the manual inspection intensity;
6. Versatile and cost-effective
It adopts the full-function double-tailed car layout to realize easy material stacking and reclaim function, multi-functional and cost-effective.

Thermoelectric-bucket-wheel-stacker-reclaimer

Coal handling line:
Stacking: coal transport by train → dumper system → coal pit → ground conveyor belt system → bucket wheel stacker and reclaimer → coal storage yard.
Reclaiming: coal storage yard→ bucket wheel stacker and reclaimer→ground conveyor belt system→coal storage bin→transport belt system→boiler.

Stacking and reclaiming:
Stacking: coal → ground belt conveyor → auxiliary tail car → main tail car → main tail car head hopper → boom belt conveyor guide trough → boom belt conveyor → coal storage yard.
Reclaiming: coal→ bucket wheel mechanism→ boom belt conveyor→ center drop hopper→ ground belt conveyor.

Weihua provide 2 sets of bucket wheel stacker and reclaimer for the 2×350,000 kW cogeneration project of Jingneng Qinhuangdao Development Zone, which is an important project for Qinhuangdao City.
http://www.weihuacraneglobal.com/case/Weihua-Bucket-Wheel-Stacker-and-Reclaimer-for-Thermoelectric-Company.html
Email: weihua@craneweihua.com