我的博客列表

2019年7月14日星期日

Overhead Crane at Crane Production Workshop



Overhead Crane at Crane Production Workshop
This is a double girder overhead crane (Email: weihua@craneweihua.com) servicing at a crane production workshop at Weihua Group. You can see many crane beams/girders on the ground waiting for being handled.
Email: weihua@craneweihua.com

2019年7月13日星期六

Gantry Crane with Electric Hoist / Weihua Crane

MH model gantry crane with electric hoist is used together with CD1, MD1 model electric hoists, which is a small and medium-sized gantry crane travelling on tracks. The general lifting weight is 5-20t, span is 14-35m, and working temperature is -20~ +40 degrees.

gantry crane with electric hoist
gantry crane with electric hoist



This gantry crane with electric hoist is a regular crane widely used at open ground and warehouses to load or grab materials. There are two kinds of operation: ground or air operation. The crane power supply can be through cable car and cable drum reel, and customers can choose one of them.
Email: weihua@craneweihua.com

Truss Gantry Crane / Weihua Crane

The truss gantry crane is designed and manufactured according to the standard JB / T5663-2008 of the Ministry of Machinery Industry of China. CD1, MD1 electric hoists and trolley can be fitted on this crane. The cantilever parts can be designed according to the factory operating space.

truss gantry crane 



The truss gantry crane has latticed structure with a small windward area, light weight, good lifting ability and so on. This truss gantry crane is an ideal lifting equipment employed in the warehouse, freight yard, terminals and other places.

There are two ways of the crane traveling: separated drive and drive brake. This product can be controlled on ground and operating room. The operating room can be open or closed, which can be installed on the left side or right side and there are 3 ways to enter the room, side, end face and top to meet the needs of users in a variety circumstances.
Email: weihua@craneweihua.com

2019年7月2日星期二

Double Girder Semi-Gantry Crane / Weihua Crane

Gantry crane is a special kind of overhead crane. This double girder semi-gantry crane only has one side support leg, while the other side is mostly supported by walls of workshop/warehouse.

The double girder semi-gantry crane is mainly applied to lift and convey stuff outdoors. The A type supporting legs under the main girder runs directly on the ground track.

double girder semi-gantry crane


Girder Structure:
1. Truss girder:
The truss girder is welded of angle steel or I type steel with the advantage of low cost, light weight, better wind resistance, but because of more welding point, large deflection, small stiffness, lower reliability, the truss type gantry crane is suitable for the fields with lower safety requirements and smaller lifting weight.

2. Box girder:
The box structure is welded of steel plate with features of high security, big stiffness, which is generally applied to the operation of large tonnage stuff, while the box girder has the shortcomings of high cost, big self weight, and poor wind resistance.



3. Box double girder:
Double girder semi-gantry crane have the features of big lifting capacity, big span, good overall stability, various types, but the self-weight is larger than the other single girder gantry crane with the same lifting capacity.

Safety Protection:
1. Overload limiter;
2. Polyurethane rubber buffer, long service life and impact resistance;
3. Crane travelling limit switch;
4. Loss pressure protection, fault phase protection;
5. Emergency stop system;
6. Lifting height limiter;
Email: weihua@craneweihua.com

Rubber Tire Track Laying Crane

The rubber tire track laying crane is more advanced than the traditional track-laying technology. It can be used to lift the tracks with two sets of cranes and carry the tracks into the tunnel for track laying. At the same time, it can be also used to lifting concrete tanks and with casting function.

rubber tire track laying crane
rubber tire track laying crane


The ballastless track project of the Israeli tunnel is an important project of the Tel Aviv light rail project. It is the largest government-licensed infrastructure construction project in Israel with the largest investment scale, complicated construction and large technical difficulty.

The traditional track laying method: firstly lay a temporary auxiliary track for the track laying machine and the concrete pouring car, and then lay the railway track by the track laying machine; after the construction of the concrete pouring car is completed, the temporary auxiliary track is removed. The process is complicated, a lot of equipment is used, and the construction period is long.

The advanced track laying method: the tire-type track laying crane has the functions of laying track and pouring concrete, and does not need temporary track, requires less construction equipment, saves labor and time.

The whole foundation of the ballastless track can replace the loose gravel bed track, which has the advantages of good smoothness, high stability, long service life and less maintenance work. The train can run at speeds of more than 350km/h, which is the world's advanced track technology.
Email: weihua@craneweihua.com

2019年6月27日星期四

Overhead Crane at Crane Production Workshop



Overhead Crane at Crane Production Workshop

http://www.weihuacraneglobal.com/product/Overhead-Crane_1.html

This is a double girder overhead crane (Email: weihua@craneweihua.com) servicing at a crane production workshop at Weihua Group. You can see many crane beams/girders on the ground waiting for being handled.

Mobile Roof Panel Making Machine





Mobile Roof Panel Making Machine

This is a mobile roof panel making machine (Email: weihua@craneweihua.com) used for forming and conveying roofing panels of steel structure workshops which is composed of chassis, lift mechanism, roof steel tile or panel making machine. Max. lift height: 16.5m, Max. luffing: 70°, Roof panel thickness: 1mm.
Email: weihua@craneweihua.com