Overhead Cranes, Gantry Cranes, Container Cranes, Port Cranes, Electric Hoists, Crane Accessories... Homepage: https://www.weihuacraneglobal.com
我的博客列表
2019年6月27日星期四
Overhead Crane at Crane Production Workshop
Overhead Crane at Crane Production Workshop
http://www.weihuacraneglobal.com/product/Overhead-Crane_1.html
This is a double girder overhead crane (Email: weihua@craneweihua.com) servicing at a crane production workshop at Weihua Group. You can see many crane beams/girders on the ground waiting for being handled.
Mobile Roof Panel Making Machine
Mobile Roof Panel Making Machine
2019年6月26日星期三
32t Gantry Crane / Weihua Crane
The ME32+3t-30m A5 gantry crane is a large lifting gantry crane designed and manufactured for the People's Liberation Army. It is mainly used for underground construction and lifting work of equipment and personnel.
32+3t-30m A5 gantry crane |
1. The trolley hoisting mechanism adopts double mechanism arrangement to increase the capacity of the rope and safety;
2. The hoisting mechanism adopts redundant design with height display and it has protection functions in case of broken shaft, broken rope, over speed, overload;
3. The gantry structure adopts lightweight design and finite element analysis to make the structure more optimized and reasonable, and its own weight is light, which reduces the wheel pressure;
4. Variable span, suitable for different site conditions;
5. Overall processing of crane and trolley with high assembly precision;
6. The components are durable and maintenance-free, equipped with hardened surface reducer, welding reel, rolling pulley and forged wheel;
7. Quick on-site installation and disassembly;
8. The whole machine adopts frequency conversion and PLC control technology, which has stable lifting operation, small impact and low noise;
9. The overall design of the crane is a perfect combination of CTS system and mechanical design, with stable operation;
10. The whole machine is equipped with electrical intelligent anti-sway function, which greatly improves the production efficiency of the whole machine and prolongs the service life;
11. With intelligent monitoring system, monitor and record the operating parameters of the crane;
12. Equipped with manual and button control, use the upper and lower software limit to decelerate and stop, and use the touch screen to adjust the lift height.
Email: weihua@craneweihua.com
Container Gantry Crane for Railway Freight Yard / Weihua Crane
This gantry crane is for container handling used at railway freight yard. With the features of strong U-type gantry structure, double cantilever with rods, and light weight, this railway gantry crane has enough span and space for container handling with a 360° rotating spreader.
gantry crane is for container handling |
Electrical Control System:
1. Digital frequency conversion and PCL control;
2. High Precision Sensor Data Acquisition Technology;
3. Industrial computer data analysis and processing system.
Operation Flow:
1. The container handling instructions are sent from the central control room to the working crane.
2. The driver cabine receives the instructions.
3. The crane driver starts the loading and unloading operation by the linkage table touch screen.
4. Touch screen real-time displays the spreader, crane and trolley position.
5. The control system temporarily receive plug-in jobs, while it gives priority to the ongoing job, then perform the plug-in job after finishing the current job.
6. Precise container positioning technology.
Machine vision accurately identify the location of container keyhole and read the container number, then intelligent control system adjust the spreader position and deflection angle to realize accuracy locking and precision container stacking.
7. Linkage table touch screen real-time displays the spreader, crane and trolley position.
8. This crane is equipped with PDS system, if the crane position does not correspond to the indication position from the PDS system, the crane does not execute the command, and sends out the alarm information. After the driver moves the crane to the system indication position, the crane continues to execute the handling command.
9. Programmed path planning and obstacle avoidance technology for optimizing path and obstacle avoidance.
10. The use of infrared space scanning carry out real-time scanning of yard container storage situation, and updating yard stacking 3d database. Spreader is controlled by intelligent program to run along the optimal path for intelligent obstacle avoidance to ensure safe working.
11. The central control room receives the completion information feedback of the crane and sends it to the database.
Email: weihua@craneweihua.com
2019年6月20日星期四
Rubber Tire Gantry Crane for Steel Pipe Handling / Weihua Crane
This gantry crane is a rubber tyred mobile crane with electromagnetic beam spreader for handling of steel pipes. Rubber tire gantry crane for steel pipe handling works outdoor, can lift several steel pipes at once, carry out 0° traveling, 45°traversing, 90°traversing and in-place steering.
Lifting Capacity: 10+10t (without hook and magnet); 18+18t (without hook)
Classification Level: A6
Max. Lifting Height: 6m
Max. Wheel Load: 300KN
Operating slop: 3% (full load); %8 (unload)
Operation: Operator's cabin
Cross Traveling Mechanism
Traveling Speed: 30m/min
Running Mode: Traction straight
Driving Mode: Hydraulic
Long Traveling Mechanism
Traveling Speed: 100m/min
Running Mode: Straight, transverse, fixed point, rotation
Driving Mode: Hydraulic
Email: weihua@craneweihua.com
Overhead Crane Destructive Test in Mongolia
Rated load 20t; while overload 27.7t
Time: June 5, 2019
Location: Ulaanbaatar City, Mongolia
Event: An LH-type electric double girder overhead crane with a rated load capacity of 20t is undergoing acceptance test.
Moment: 14:30
The crane test began.
After successfully passing the no-load operation, the crane statically loads the 20t steel plate hangings. After 10 minutes, the crane load moves back and forth and left and right. After strict testing by the test personnel, all aspects of the crane performed well and passed the tests smoothly.
Moment: 14:55
In order to verify the performance of the crane, the customer temporarily decided to increase the weight of the load for the destructive overload test.
The steel plate was slowly added to 24t, and the crane began to lift for static load test. Engineers and workers are hiding outside the factory, and they are far away from the gate, leaving only our engineers and testers to continue testing. 1 minute, 2 minutes, 3 minutes...10 minutes, the crane successfully completed the static load test. The hoist moves left and right, the crane moves forward and backward, and the crane successfully completes the 24t dynamic load test. Weihua crane successfully passed another test!
Time: 15:15
The trial is not over yet! Customer continue to increase weight!
24t, 25t, 26t... The weight of the hanging object finally stayed at 27.7t, and the crane started another challenge! The on-site personnel who had been hiding outside the factory slowly began to approach. Lifting and holding, everyone at the site is watching the state of the crane; the crane moves left and right, back and forth, and everyone's attention follows the test. In the end, Weihua lifted its expectations and succeeded in passing the challenge again!
The measurement of infrared instruments shows during the test, the degree of crown, side bends and other aspects of Weihua Crane have reached international standards. After the test, the entire system staff gave a thumbs up, and the manager said: OK! OK! Very Good!
Email: weihua@craneweihua.com
2019年6月12日星期三
Gantry Crane for Subway Construction / Weihua Crane
With the rapid development of the economy, population and the rapid growth of motor vehicles, many cities have emerged a serious 'urban disease' - a large traffic jam. Subways come into being. Because the subway is comfortable, fast and convenient, it is becoming an important parts of transport in many urban cities.
With the fast development of subways, the construction machines, especially the cranes, are becoming an important role for the subway construction. Weihua has rich experience and many project cases on subway construction gantry crane.
subway construction gantry crane |
Subway gantry crane for slag handling is used for subway tunnel construction. This crane is mainly responsible for the construction of the subway tunnel, lifting the dregs excavated by shield excavator to the ground. Features of subway slag gantry crane:
◆ variable span, improve crane utilization;
◆ cantilever detachable, more practical;
◆ running fast, high work duty, high efficiency;
◆ high lifting height;
◆ with special tilting spreader with automatically tipping.
1. The gantry crane for subway construction is used for dealing the dregs and site material handling during subway construction.
2. With the span-changed function of Min. step-length 100mm, this subway construction gantry crane is suitable for various working conditions.
3. The cantilever is detachable, also can preserve the cantilever interface which will be flexible for different working conditions.
4. There is lightning protection system, wind speed detection warning system.
5. The gantry crane for subway construction is equipped special spreader and realize the interchange of dregs bucket and the hook.
6. With the overturn hook, it realizes overturning the dregs at any position in the air. Overturning dregs system is controlled by the hydraulic which makes the overturning process more stable.
7. The trolley is rotatable, and can realize the front, side transporting dregs.
Email: weihua@craneweihua.com
Dam Floodgate Gantry Hoist / Weihua Crane
The dam top floodgate gantry crane is mainly used for hydraulic equipment transport, installation and maintenance of hydroelectric generating units such as floodgates, trash rack etc.
Model MQ gantry crane can be divided into two kinds: unidirectional crane and bidirectional crane. The unidirectional hoist is fixed on the gantry frame. The Gantry runs along the track on the dam. And its service zone is a line, which can only be used to lift a gate of the same row, while the double direction gantry crane is with a trolley running perpendicular to the crane traveling. Thus, the double direction gantry crane can lift the floodgate or trash racks of different rows of upstream side and the downstream side.
Features of Dam Floodgate Gantry Crane:
1. Steel plate or box-type girder, electric driving motor of lifting mechanism, gear reducing hoist;
2. The operating mechanism of the crane is driven by the motor, and the closed operating room is mounted on the frame;
3. Running buffer device and windproof rail clamp are equipped under the gantry leg;
4. The spreader moves up and down along the gate slot or around the hinge of the gate;
5. The opening and closing of the gate in the movable water is related to the size of the load and the water hydrodynamic pressure;
6. For large span gate, it needs double lifting points and keep synchronization;
7. Large Lifting capacity, low speed, low work level, generally not more than 4 m / min, only for some quick gate, it can reach 10-14 m / min;
Dam crane hoist/crane can be mainly divided into two kinds according to their different structures.
1. Fixed type hoist: winding type, rack type, chain type, screw type and hydraulic type;
2. Mobile type hoist: gantry type, semi-gantry type, bridge and trolley type;
Email: weihua@craneweihua.com
2019年6月4日星期二
Gantry Crane for Shield Tunneling Machine / Weihua Crane
Gantry crane for shield tunneling machine is used for lifting of the cutter and shield body of underground non excavation shield tunneling machine and the tunnel support segment in the process of the construction. The trolley of this gantry crane is a rotating disc adapts to the demand of different digging direction with flexible operation, perfect safety instructions and overload protection device system.
PLC frequency conversion adjustment system makes it easy to control every mechanism.
Gantry crane for shield tunneling machine |
Features of Shield Tunneling Machine Gantry Crane:
1. Spreader with 360° rotation is fit for installation of cutter from different angles;
2. Double trolley mechanism is applied for lifting cutter by double trolley or lifting duct piece by single trolley;
Working Environment:
1. 3 phase A.C. 50HZ 380V
2. The temperature of the working environments is -20 ~ +45 degrees and.the Max relative humidity shall be less than 95%( with condensation);
3. Wind speed shall be less than 20m/s;
4. Working leave: A3, A4;
5. Special requests are available;
Email: weihua@craneweihua.com
Boat and Yacht Handling Crane / Weihua Crane
Yacht handling cranes, also known as boat handlers. It is widely used in water sports games, yacht clubs, navigation, shipping and learning, etc. It can transport different tonnage (32 tons - 1000 tons) of boats or yachts from the shore dock for on-shore maintenance, repair or launching of new vessels.
Yacht handling cranes |
The boat and yacht handling crane includes the following items: main structure, traveling wheel block, hoisting mechanism, steering mechanism, hydraulic transmission system and electric control system. The main structure is N type, which can transfer the boat/yacht with height surpass crane's height.
According to different requirements of our customers, the boat handling crane can handle different tonnage boats or yachts (10T-800T) from the shore side, it can be used for the maintenance on the shore side or can put the new boat into the water. This yacht handling crane has soft and firm belt to lift the boat and yacht so that it will never hurt the surface. This crane also can put the boat in sequence quickly with small gap between each two boat.
Features of Yacht Handling Crane:
1. For the crane traveling, this crane can move in diagonal direction, this boat and yacht handling crane also can steer in 90 degree and put the boat in any designated position according to requirements.
2. This crane can be adjusted the width of the main girder according to the boat in case to handling different side boat.
3. This yacht handling crane is of low expense, high performance, easy to operate and maintenance and so on.
4. Low cost on the daily operation, it adopts the soft and firm belt to ensure there is no harm to the boat when hoisting.
5. This boat crane can make the boat in order quickly; it also can adjust the gap between each boat according to different condition.
Email: weihua@craneweihua.com
2019年6月3日星期一
Weihua Crane and Parts Packing
The video shows the crane parts packing (Email: weihua@craneweihua.com) You can see the wooden case packing and Triangle steel and keel for the fix of wooden case and crane parts.
Metallurgy Overhead Crane with Rotary Fork Style Lifter
This is a double girder overhead crane (Email: weihua@craneweihua.com) for metallurgy industry. The hoist mechanism is a special sling - rotary fork style lifter. Yes, the fork lifter is rotatable with a rotary hoist trolley traveling on the bridge beams.
http://www.weihuacraneglobal.com/product/Overhead-Crane-for-Metallurgy.html
订阅:
博文 (Atom)